T129 hot and high in Pakistan
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
Registruj se da bi učestvovao u diskusiji. Registrovanim korisnicima se NE prikazuju reklame unutar poruka.
|
|
|
Poslao: 13 Okt 2016 14:08
|
offline
- Toni

- SuperModerator
- Pridružio: 18 Jun 2008
- Poruke: 33280
|
Italijani prave novu verziju/zamenu
Citat:For 487 million euros, the armed forces plan to get a prototype, three pre-series aircraft and one initial operating capability-level aircraft, as well as the later upgrade of the three pre-series versions to IOC level, all by 2025.
Designed to fly three-hour missions, the new aircraft will offer a 20mm cannon, 70mm rockets and Spike air-to-ground missiles, with a 1,400 kg payload that may rise to 1,600 kg, according to the documents.
The new Mangusta would also feature satellite communications and Link 16.
In a planning document issued in 2015, the Army said it wanted a new Mangusta to be able to control UAVs and be able to operate better in hot and high conditions.
Planned to be a viable assault helicopter for the next 30 years, the new model would have performance and payloads “decisively superior” to the current Mangusta and be at least as good as “the best performing helicopters in its category”, the new document stated.
The Army currently has 48 Mangustas flying, of which 32 have been upgraded from the original spec, while 16 are used for training.
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|
|
|
|
Poslao: 10 Dec 2016 19:32
|
offline
- Gavrilo Milentijević
- Komandir stanice milicije Gornje Polje
- Pridružio: 12 Feb 2005
- Poruke: 37603
- Gde živiš: ovalni kabinet
|
Inače sva dešavanja u vezi ovog helikoptera možete pratiti na tviter stranici T129 ATAK
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|
|
|
|
Poslao: 15 Jan 2017 10:47
|
offline
- djox

- djox
- Pridružio: 23 Nov 2010
- Poruke: 112799
|
Italijani potpisali
Citat:The Italian National Armaments Directorate of the Italian Defense Ministry has given Leonardo a contract to develop a replacement for the Italian Army’s A129 gunship.
Leonardo to develop replacement for A129
Citat:The multiyear contract for the new exploration and escort helicopter (NEES) of the Italian Army envisages the study, development, industrialization, production and testing of a prototype and three initial production aircraft. Through this new programme, based on a total requirement for 48 units, the Italian Army will be able to replace the current fleet of AW129 which are expected to be retired from service by 2025 following over 35 years in operations. The NEES programme will benefit from the long operational expertise gained by the Italian Army thanks to the AW129 and from the know-how of Leonardo in this specific helicopter sector. It will allow the service to introduce an even more technologically advanced product, with greater performance and lower operating costs, to meet arising needs in evolving scenarios for the next 30 years.
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|
|
Poslao: 08 Feb 2017 18:55
|
offline
- djox

- djox
- Pridružio: 23 Nov 2010
- Poruke: 112799
|
Navodno se sprema prodaja za Pakistan
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|
|
Poslao: 09 Apr 2017 19:47
|
offline
- djox

- djox
- Pridružio: 23 Nov 2010
- Poruke: 112799
|
Turcima isporucen 20-ti
Turkish Armed Forces receives the 20th T129 ATAK helicopter
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|
|
|
|
Poslao: 25 Avg 2017 10:22
|
offline
- Toni

- SuperModerator
- Pridružio: 18 Jun 2008
- Poruke: 33280
|
Nova turska raketa
Citat:Roketsan has begun serial production of the UMTAS (Uzun Menzilli Tanksavar Sistemi) imaging infrared (UMTAS-IIR) variant, long-range anti-tank guided missile (ATGM), following successful finalisation of the development and qualification of the missile – including firing trials from a Turkish Aerospace Industries (TAI)/AgustaWestland T129 ATAK helicopter – earlier this year.
"The UMTAS-IIR development is a three-phase programme: design; development and qualification; and serial production. The first two phases have already been completed, and a five-year production contract was awarded to Roketsan following the finalisation of contract negotiations with the Turkish Armed Forces [TAF] in December 2016. This will run from 2017 through to 2022," a Roketsan official told Jane's . In July, Roketsan signed a EUR24.6 million (USD29 million) sub-contract with Aselsan for the manufacture and production of the uncooled IIR seeker for the UMTAS-IIR variant.
Initial deliveries of the first contract to the TAF are expected to begin in 2018, and are scheduled for completion by 2022; the quantities of missiles have not been disclosed. In the interim, Roketsan is expecting further production contracts for the IIR variant, as well as possible additional orders for the L-UMTAS.
[Link mogu videti samo ulogovani korisnici]
|
|
|
|
|
|